Colorado is in the middle of an energy infrastructure boom. Battery energy storage systems, BESS projects, are being developed across the state to store electricity generated by renewable sources and release it when the grid needs it most. These projects require substantial land, long lease terms, and complex legal structures that most property owners have never encountered.
Over the past year, I’ve negotiated several BESS ground leases on behalf of Colorado landowners. What I’ve learned is that BESS leases are fundamentally different from the solar and wind leases that preceded them, and vastly more complex than traditional commercial ground leases. The legal and business issues are nuanced, the economics are opaque, and the long-term risks to property owners are substantial.
If a developer approaches you about leasing your land for a battery storage project, this article will help you understand what you’re being asked to agree to and what you should be negotiating before you sign.
What Is a BESS Project, and Why Does It Require a Ground Lease?
A battery energy storage system is a large-scale facility that stores electrical energy and releases it to the grid on demand. Unlike solar or wind projects that generate electricity, BESS projects store energy produced elsewhere, often from renewable sources, and discharge it during periods of high demand or grid instability.
A typical commercial BESS project in Colorado might occupy less than an acre of fenced, secured area for the battery units themselves, but require easements across several additional acres for access roads, transmission infrastructure, stormwater management, and construction staging. The lease term is typically 20 to 40 years, with multiple renewal options that can extend the total commitment to 60 years or more.
Because these projects require substantial capital investment and long-term financing, BESS leases include provisions designed to protect the project developer and its lenders. Many of those provisions, if accepted without negotiation, transfer significant risk and control to the developer while limiting the property owner’s rights for decades.
The Fundamental Tension: Project Financing vs. Property Owner Rights
The core challenge in negotiating a BESS lease is balancing two legitimate but competing interests. The developer needs lease terms that satisfy its lenders terms that ensure the project can be financed, built, and operated without interference from the landowner or the landowner’s creditors. The landowner needs protections that ensure the project actually gets built, that the land remains marketable and financeable, and that the landowner retains meaningful access and control over property that will remain in the landowner’s name for 40-plus years.
Developers and their attorneys frequently frame this tension as: ‘Our lenders require this provision.’ That argument deserves scrutiny. Some lender requirements are legitimate and industry-standard. Others are developer wish-list items presented as non-negotiable financing requirements. Knowing the difference is critical.
Key Principle: Just because a developer says their lenders require a provision does not mean the provision is reasonable, balanced, or necessary. Institutional lenders finance hundreds of BESS projects nationwide using lease forms that are far more balanced than what you may be presented with initially.
Development Milestones: Ensuring the Project Actually Gets Built
One of the most important provisions in any BESS lease, and one that developers routinely resist, is the requirement that the developers meet specific development milestones within defined timeframes.
A typical BESS lease includes a Development Term of two to four years during which the developer pays a modest annual fee (often $7,500 to $15,000 per year) for the exclusive right to develop the project. During this period, the developer is securing permits, negotiating interconnection agreements with the utility, arranging financing, and preparing to begin construction.
The problem arises when the lease contains no enforceable deadlines. Without milestones, a developer can pay nominal Development Rent for three or four years, fail to submit permit applications, never begin construction, and then walk away, leaving the landowner with $30,000 in rent over four years and a property that has been off the market and unavailable for other uses during that entire period.
Landowners should insist on development milestones that include: (a) submission of all necessary permit applications within 12 to 18 months of the lease effective date, (b) commencement of construction within 24 to 36 months of the lease effective date, and (c) achievement of commercial operations within 18 to 24 months after construction begins. These deadlines should include reasonable extensions for force majeure events or delays caused by the landowner, but they should not be optional.
Developers often argue that development milestones are unnecessary because the lease already requires the developer to begin paying Operations Rent (the much higher annual rent during the operational phase) within a certain period after construction starts. This argument misses the point. Operations Rent tied to the Construction Start Date doesn’t protect the landowner if the developer never starts construction in the first place.
Negotiation Tip: If the developer claims development milestones are unnecessary, ask: ‘If you’re confident the project will be built on schedule, why do you object to committing to deadlines?’ Legitimate developers who intend to build have no reason to resist reasonable milestone requirements.
Minimum Rent Guarantees and Project Size Flexibility
BESS leases typically calculate Operations Rent as a dollar amount per square foot of the leased area, subject to annual escalations. A common rate in Colorado might be $5.00 to $6.00 per square foot per year. If the developer represents that the project will occupy 18,000 square feet, the landowner reasonably expects an annual Operations Rent of $90,000 to $108,000.
The issue arises when the lease allows the developer to reduce the size of the leased area at any point during the Development Term, with no minimum size requirement and no minimum rent guarantee. Under such terms, the developer could decide after two years that the project will be half the originally represented size, reducing the leased area from 18,000 square feet to 9,000 square feet and cutting the landowner’s expected rent in half.
Developers argue they need flexibility because final project size depends on factors like interconnection capacity, utility requirements, and market conditions that won’t be known until late in the development process. That argument has merit, but the solution is not to give the developer unlimited flexibility to slash rent after the landowner has already committed to the lease.
The better approach is to negotiate either a minimum leased area (for example, no less than 12,000 square feet, or two-thirds of the originally represented project size) or a minimum annual Operations Rent regardless of project size. If the developer is uncertain about final project size, the uncertainty should be shared, not transferred entirely to the landowner.
Easements: The Hidden Acreage Problem
One of the most underappreciated issues in BESS lease negotiations is the treatment of easements. The leased area, the fenced secured footprint where the battery units and associated equipment will be located may be only half an acre. But the developer will also require easements for access roads, transmission lines, stormwater management, and temporary construction staging. Those easements can easily cover an additional two to four acres.
Many BESS leases provide annual rent for the leased area but zero compensation for the easement areas. The developer’s position is often: ‘Easement compensation is baked into the Operations Rent.’ But the math does not support that claim.
If Operations Rent is $5.00 per square foot on a half-acre leased area, the landowner receives roughly $109,000 per year. If the easements burden an additional three acres, the total impacted area is 3.5 acres. For the ‘baked-in’ argument to hold, Operations Rent would need to be $15 to $18 per square foot, three times the stated rate, to fairly compensate for all impacted acreage.
Easements are not temporary. They run for the entire lease term, often 40 years or more. A landowner who gives a developer easements over three acres without compensation is giving away the productive use of that land for four decades.
The standard approach in balanced BESS leases is to pay a one-time easement fee, typically $8,000 to $12,000 per acre, for easement areas outside the leased area. This compensates the landowner for the long-term impact on property value and usability without imposing an ongoing annual burden on the project economics.
Landowner Access Rights: Safety vs. Control
Developers routinely seek to limit or eliminate the landowner’s right to access the leased area during the operational term. The stated reason is always safety: battery storage systems involve high-voltage equipment, and unauthorized entry could result in injury or death.
That safety concern is legitimate. But the solution is not to prohibit landowner access entirely. The solution is to require advance notice and safety protocols.
A reasonable landowner access provision allows the landowner to enter the leased area with 48 hours’ advance written notice for purposes of inspection, and at any time without notice in the event of an emergency. The developer can require that the landowner be accompanied by a company representative during non-emergency visits and that the landowner follow all safety rules.
Developers who insist on prohibiting landowner access entirely are not motivated primarily by safety concerns. They are seeking control. They want to prevent the landowner from observing non-compliance, damage, or violations that might give rise to disputes or enforcement actions.
From the landowner’s perspective, the right to inspect your own property is fundamental. You retain liability exposure. You need to verify compliance with environmental regulations, zoning requirements, and lease terms. You need the ability to show the property to prospective buyers or lenders if you decide to sell or refinance. Access rights with reasonable notice and safety protocols are non-negotiable in any balanced lease.
Lender Protections: Separating Legitimate Requirements from Overreach
BESS projects are capital-intensive and almost always require institutional financing. Lenders need certain protections to ensure their collateral, the leasehold interest and the project itself, remains secure even if the developer defaults or files for bankruptcy. Those protections are standard and reasonable, and landowners should expect to agree to them.
Legitimate lender protections include: (a) the right to receive copies of any default notices sent to the developer, (b) additional time beyond the developer’s cure period to cure defaults (typically 30 to 60 additional days), (c) the right to foreclose on the lease and step into the developer’s position, and (d) a subordination, non-disturbance, and attornment agreement ensuring that the lease remains in effect even if the landowner’s lender forecloses on the property.
Where developers overreach is in demanding provisions that go far beyond what institutional lenders actually require. Three provisions in particular warrant close scrutiny:
The Forced New Lease Provision
Some BESS leases include a provision requiring the landowner, upon written demand from the developer’s lender, to enter into a brand-new lease with the lender (or the lender’s designee) if the original lease is terminated due to the developer’s default or bankruptcy. The new lease would have the same terms as the original lease and would run for the remainder of the original term — potentially 30 or 40 years.
This provision is unconscionable and non-standard. If the developer defaults or files bankruptcy, the lender already has the right to foreclose on the lease and take over the developer’s position. That is sufficient protection. Forcing the landowner into a new multi-decade lease with a party the landowner never agreed to do business with — after the original developer has already demonstrated its inability to perform — goes far beyond reasonable lender protection.
I have negotiated dozens of ground leases for energy projects and have never seen this provision in a lease drafted by a competent, ethical attorney representing a balanced transaction. If your lease contains a forced new lease provision, it should be deleted entirely.
Unlimited Lender Cure Periods
Most BESS leases give the developer’s lenders additional time to cure defaults beyond the cure period given to the developer. A standard and reasonable formulation is: 30 additional days for payment defaults, 60 additional days for non-payment defaults. This gives the lender time to assess the situation, decide whether to cure or foreclose, and take action.
Some leases go further and provide that the lender’s cure period extends for ‘the time reasonably required’ to complete the cure, including the time required to complete foreclosure proceedings. This can stretch the cure period to two years or more.
Unlimited cure periods are problematic for landowners because they effectively prevent termination of the lease for material breaches. If the developer stops maintaining the property, violates environmental regulations, or fails to meet operational requirements, the landowner’s remedy is to issue a notice of default and, if uncured, terminate the lease. But if the lender has unlimited time to cure — time that may extend through lengthy foreclosure proceedings — the landowner is stuck with a non-performing tenant indefinitely.
The balanced approach is to cap lender cure periods at reasonable limits: 90 days total for payment defaults, 150 days total for non-payment defaults. This provides ample time for lenders to act while preserving the landowner’s ability to terminate the lease for material, uncured breaches.
Automatic Subordination of Future Landowner Mortgages
Some BESS leases require that any mortgage, deed of trust, or other encumbrance placed on the property by the landowner after the lease effective date must be subordinate to the lease. The effect of this provision is to make the lease senior to the landowner’s mortgage, meaning that if the landowner defaults on the mortgage and the lender forecloses, the lease remains in place and the foreclosing lender takes the property subject to the lease.
Developers argue that this is necessary to protect the project and the developer’s lenders. But the argument confuses two different issues.
It is standard and appropriate for the lease to be senior to future mortgages placed by the landowner. That protects the developer’s leasehold interest and ensures the lease survives if the landowner’s lender forecloses. The landowner should agree to this.
What is not standard, and what many leases improperly demand, is that the landowner’s lender must subordinate its mortgage to the lease. In other words, the lease not only survives the foreclosure, but the landowner’s lender must agree in advance that the lease has priority.
The problem with automatic subordination is that it makes the landowner’s property difficult or impossible to finance. If a prospective lender knows that a long-term commercial lease will have automatic priority over its mortgage, the lender may refuse to make the loan or may demand substantially higher rates to compensate for the reduced collateral value. This destroys the landowner’s ability to refinance or leverage the property for 40-plus years.
The solution is to state clearly that the lease will be senior to future encumbrances, but that subordination of the landowner’s lender to the lease is not automatic and will be negotiated on a case-by-case basis through a subordination, non-disturbance, and attornment agreement (SNDA) if and when the landowner seeks financing. This protects the developer’s leasehold while preserving the landowner’s ability to mortgage the property.
Early Termination and Liquidated Damages
BESS leases typically allow the developer to terminate the lease at any time during the Development Term upon relatively short notice, often 30 to 90 days. This gives the developer flexibility to walk away if the project is not economically viable.
The question is: what happens to the landowner if the developer terminates in year two or year three of the Development Term?
By that point, the landowner has likely turned away other prospective tenants or buyers in reliance on the developer’s commitment. The property has been off the market for years. If the developer walks away and the only compensation is the modest Development Rent paid to date, perhaps $25,000 to $35,000 total, the landowner has been substantially harmed.
To address this, landowners should negotiate for liquidated damages payable if the developer terminates after a certain point in the Development Term. A common structure is: no liquidated damages if termination occurs in year one, $15,000 to $30,000 in liquidated damages if termination occurs after year one.
Developers resist this, arguing that Development Rent already compensates the landowner for the option period. But Development Rent compensates for the initial holding period. Liquidated damages compensate for the opportunity cost of having the property tied up and other deals lost if the developer terminates late in the Development Term after the landowner has relied on the project moving forward.
Subordination, Non-Disturbance, and Attornment Agreements
If the property is already subject to a mortgage when the BESS lease is signed, the landowner’s lender holds a lien that is senior to the lease. This creates a problem for the developer: if the landowner defaults on the mortgage and the lender forecloses, the lease could be extinguished, and the developer could lose its leasehold interest and the project.
To protect against this, developers require the landowner to obtain a subordination, non-disturbance, and attornment agreement (SNDA) from the landowner’s existing lender. The SNDA provides that the lender’s mortgage will be subordinate to the lease, that the lender will not disturb the developer’s possession if the lender forecloses, and that the developer will attorn to (recognize) the lender as the new landlord if foreclosure occurs.
Obtaining an SNDA from an existing lender can be difficult. Lenders are not required to subordinate, and many will refuse or will agree only if the lease terms are modified to protect the lender’s interests. The landowner should make clear that while the landowner will use commercially reasonable efforts to obtain an SNDA, the landowner cannot guarantee that the existing lender will agree. If the lender refuses, the developer must decide whether to proceed without the SNDA or negotiate directly with the lender.
When ‘Financing Requirements’ Are Really Developer Wish-Lists
Throughout any BESS lease negotiation, the developer will invoke ‘our lenders require this’ as the justification for one-sided terms. This argument should be evaluated critically.
Institutional lenders, banks, private equity funds, and infrastructure investors who finance hundreds of energy projects, have established standards for lease terms they require.
Standards are reasonable and balanced because lenders know that one-sided leases create litigation risk and operational problems that can jeopardize their investment.
When a developer demands terms that go beyond industry-standard lender protections, such as forced new leases, unlimited cure periods, automatic subordination, prohibition on landowner access, zero accountability for development milestones, then the developer is not conveying lender requirements. The developer is trying to shift all risk and control to the developer’s side of the table while using ‘financing requirements’ as cover.
Competent lenders do not require unconscionable terms. They require terms that protect their collateral while allowing the transaction to function as intended. If a developer tells you its lenders require a provision that seems extreme or one-sided, ask to see the lender’s term sheet or commitment letter. Legitimate developers working with legitimate lenders should have no problem providing it (redacted for confidential information). Developers who refuse are likely overstating lender requirements to extract more favorable terms.
The Bottom Line: What Every Colorado Landowner Should Know
Battery energy storage projects represent an important part of Colorado’s energy future, and leasing land for a BESS project can be a valuable long-term revenue stream for landowners. But these leases are complex, high-stakes transactions that require careful negotiation and experienced legal representation.
If you are approached about a BESS lease, here is what you should know:
- Do not sign the first draft. The initial lease presented to you will almost certainly be a developer-favorable form that transfers substantial risk and control to the developer while limiting your rights and remedies. Everything is negotiable.
- Insist on development milestones. Without enforceable deadlines, you have no assurance the project will be built, and you may end up with nominal rent and a property that has been off the market for years.
- Require minimum rent guarantees. If the developer wants flexibility on project size, the risk of reduced rent should be shared through either a minimum leased area or a minimum annual rent amount.
- Negotiate easement compensation. Easements that burden multiple acres for 40 years should be compensated separately from rent on the leased area.
- Retain access rights. You should have the right to inspect your property with reasonable advance notice and safety protocols. Absolute prohibition on landowner access is not necessary for safety and serves only to limit your oversight.
- Scrutinize lender provisions. Agree to legitimate lender protections (notice, cure rights, foreclosure rights, non-disturbance). Reject forced new lease provisions, unlimited cure periods, and any terms that make your property unmarketable or unfinanceable.
- Protect your financing ability. The lease should be senior to your future mortgages, but subordination of your lender’s mortgage should not be automatic. Preserve your ability to refinance or leverage the property.
- Engage experienced counsel early. BESS leases are specialized transactions. An attorney with experience in energy project ground leases will know which provisions are standard and which are developer overreach. The cost of legal review is a fraction of the cost of being locked into an unfavorable lease for 40 years.
Battery energy storage is the future of grid stability and renewable energy integration. But that future should not be built on lease terms that sacrifice landowner rights and protections. With proper negotiation and experienced representation, BESS leases can be structured to benefit both the developer and the landowner — creating long-term value while preserving the rights and marketability of the underlying property.
About the Author
Robert Melun is a Colorado commercial real estate attorney with 29 years of experience representing landowners, tenants, investors, and developers in transactions across the state, including multiple battery energy storage ground leases. This article is part of The Colorado Commercial Real Estate Legal Series.